
- Pipe bridge grid (36 km)
- Pipelines
for acetic acid, liquid ammonia, caustic soda, chlorine, ethylene, sulfuric acid, fuel oil, etc. (38
km)
- Lines for raw materials/intermediates (318 km)
- public mains
supply (662 km)
- Two waste water sewer systems (production / sanitary – 40 km)
- Stormwater
collection system including a retention system
- Railway system (50 km)
- Volume
of storage tanks (70.000 m³)
- Road network (72 km)
- Protected area
(460 ha)
Huge investments are already done.
Contact:
E-mail:
kundenservice@infraserv.com